How to plan a kitchen remodel

Most kitchen remodels are planned for months before anyone swings a hammer. This is the order that keeps the budget and the schedule in your hands. Save it and work down the list.

Sec. 01

Set the budget first

Pick the top number before you look at finishes. HomeGuide's typical split shows where the money goes:

Part of the jobShare of budget
Cabinets and shelving25%
Installation and labor15%
Appliances15%
Countertops and backsplash10%
Flooring7%
Lighting, painting and drywall, designer, sink and faucet5% each
Doors and windows / plumbing / other4% / 3% / 1%

Source: HomeGuide's kitchen remodel cost guide (2026). Use the estimator or the cost guide to see what your kitchen size and level usually run.

Sec. 02

Decide the scope

  • Refresh. Same layout and cabinet boxes; new fronts, counters, backsplash, fixtures. See the refresh guide.
  • Full remodel. New cabinets, counters, floors, lighting and appliances, same layout. See the full remodel guide.
  • Redesign. Moving the sink, range or walls. The biggest jump in cost, and it needs permits.
Sec. 03

Measure and photograph

Measure the floor (length × width), each counter run, and the ceiling height. Sketch where the windows, doors, sink, range, fridge and outlets are. Take photos of each wall. Contractors can give a rougher first number from this before a visit.

Sec. 04

Check permits and HOA rules

Osceola County lists cosmetic interior work such as cabinets, tile and painting as not needing a permit; plumbing, electrical, gas and structural work does. Inside Kissimmee city limits, the City's July 2026 page says any project valued at $7,500 or more needs a permit, and exempt work still needs an exemption form approved before work starts. Many communities here also have HOA or community district rules on work hours, parking and dumpsters, so read yours.

Sec. 05

Compare quotes the same way

  • Same scope on every quote. Give each contractor the same list.
  • What's included. Demolition, disposal, cabinets, counters, backsplash, appliances, plumbing and electrical hookups, permits, paint.
  • License and insurance. Look up the license number on the Florida DBPR license search and ask for proof of insurance.
  • Payment schedule. Tied to work done, in writing.
Sec. 06

Order before demolition

Cabinets, counters and appliances can take a while to arrive, and counters are usually measured after the cabinets are in. Ask the contractor for a written schedule that shows when each item is ordered and the days the kitchen will be out of use.

Sec. 07

Plan to live without a kitchen

Set up a temporary spot with the fridge, a microwave and a place to wash up. For a vacation rental, block the booking calendar for the whole job plus a buffer. See rental and investor kitchens.

Sec. 08

Walk through before final payment

Open every door and drawer, run the water and the dishwasher, check the counter seams and outlets, and make a written punch list before the last payment.